The latest on the "Super 2 Liter"
Posted: Sun Jul 31, 2005 11:36 am
while I was away a ton happened with the project and I'm just now getting the time to write about it.
As it sits now its a complete shortblock, ready for the cylinder heads to be final prepped and installed.
I took a ton of pictures of the RAT Superfinished parts and we have uploaded them to the site under R&D at this link http://www.aircooledtechnology.com/r_d_superfinish.htm
The superfinishing is NOT a chrome plating, as it may appear. The Superfinished parts are basically polished to not only a high luster, but a super smooth finish that is sure to reduce friction as well as cut down on windage. I chose to do this process to the engine to reduce friction primarily, as friction is the one thing we have to overcome to help achieve the 50 MPG goal we have for the engine. With the Superfinishing the parts that would normally rotate with a bit of drag without oil don't anymore- For instance rocker arms slide on their shafts like glass, even bone dry with no oil at all!
The transaxle components are next to Superfinish, in their entirety. The processes create components that are so free of burrs and tight places that the tranny will really love the benefits and so will the CV Joints, which will also receive a dose of the process. The goal is to reduce drag through the engine and entire drivetrain and up efficiency!
I have all the other parts ready for assembly onto the Super 2 Liter, we are just waiting on getting the heads back from coating and the valves back from being DLC coated. The DLC reduces friction even further and stops wear in it's tracks- both of which are very welcomed.
we got the MassIVe 79 Vert back from the painters on Thursday and things will progress quickly with it now. The goal is to debut the car at the Florida Bug Jam and use the 7 hour trip there to data log our first 50 MPG trip on the way down! I refuse to work in haste, so if we can't make the show without rushing we won't be able to debut the car till next spring, which is still OK because it will give me plenty of time to really dial in the Engine Management system with the aid of the data logger and will let Beth get some good solid miles on the engine over the winter as well.
I have a ton of pics to post on the site of the car's teardown and build up- thats my goal for this week, before I get too far behind and going wide open with work on the car. Look for a post about the car's status this week.
As it sits now its a complete shortblock, ready for the cylinder heads to be final prepped and installed.
I took a ton of pictures of the RAT Superfinished parts and we have uploaded them to the site under R&D at this link http://www.aircooledtechnology.com/r_d_superfinish.htm
The superfinishing is NOT a chrome plating, as it may appear. The Superfinished parts are basically polished to not only a high luster, but a super smooth finish that is sure to reduce friction as well as cut down on windage. I chose to do this process to the engine to reduce friction primarily, as friction is the one thing we have to overcome to help achieve the 50 MPG goal we have for the engine. With the Superfinishing the parts that would normally rotate with a bit of drag without oil don't anymore- For instance rocker arms slide on their shafts like glass, even bone dry with no oil at all!
The transaxle components are next to Superfinish, in their entirety. The processes create components that are so free of burrs and tight places that the tranny will really love the benefits and so will the CV Joints, which will also receive a dose of the process. The goal is to reduce drag through the engine and entire drivetrain and up efficiency!
I have all the other parts ready for assembly onto the Super 2 Liter, we are just waiting on getting the heads back from coating and the valves back from being DLC coated. The DLC reduces friction even further and stops wear in it's tracks- both of which are very welcomed.
we got the MassIVe 79 Vert back from the painters on Thursday and things will progress quickly with it now. The goal is to debut the car at the Florida Bug Jam and use the 7 hour trip there to data log our first 50 MPG trip on the way down! I refuse to work in haste, so if we can't make the show without rushing we won't be able to debut the car till next spring, which is still OK because it will give me plenty of time to really dial in the Engine Management system with the aid of the data logger and will let Beth get some good solid miles on the engine over the winter as well.
I have a ton of pics to post on the site of the car's teardown and build up- thats my goal for this week, before I get too far behind and going wide open with work on the car. Look for a post about the car's status this week.